On Wednesday, 26 3
2014, we received from the company Ekten last major component of our wind
tunnel. Compressor intake air funnel was part of which was difficult to wait. We
started with the interesting work. Assembling all the components carried Timothy
and David.
During the assembly has shown our good planning. All joints were accurate. Even the seal between joints have a nice fit.

We screwed 56 major connections and a dozen smaller joints.

The measuring chamber is still unpainted because we will upgrade it and equip with the measuring technique.

Look upon the wind tunnel. The first assembly has been necessary due to the design of the base.

Before the May Day holiday is missing just
the stand.